Parameters
|
24L Soft Coolers Backpack |
Item No. |
Size |
Capacity |
Weight |
60Y07D |
32x20.5x66cm |
24L |
1.67kg |
Product Info
We are a factory engaged in the incubator for 15 years and have rich experience in production and export. We have various styles and sizes, supporting OEM and ODM to meet various customer needs. Our products are sold all over the world if you have the opportunity to visit our factory.
Key Features:
1. Superior Insulation: Our coolers use advanced insulation technology to maintain optimal cold temperatures for up to 2 days, ensuring your food and beverages stay fresh.
2. Robust Construction: Built with high-quality, scratch-resistant materials, our coolers can withstand the toughest outdoor conditions.
3. Seamless Lid Design: The airtight, leak-proof lid ensures maximum insulation and prevents spills.
4. Versatile Usage: Perfect for camping, picnics, beach trips, and outdoor events, our coolers are a must-have for any adventure.
About the mark of the logo.
We usually use screen printing.
About our MOQ.
Normally, our MOQ for each product is 500-1000pcs for a single color. Of course, we are also very flexible. We will also flexibly control according to your different products or requirements.
About our R&D design team.
We are committed to creating innovative and competitive products for our customers. Therefore, we are equipped with a professional laboratory, investing at least 400,000 US dollars and a lot of workforce to research new products yearly.
About the provision of samples.
We are very happy to provide samples for your feelings; it will take about 5-7 days lead time. You need to pay some sample cost, but you can rest assured that once the order is confirmed, we can return this part of the sample cost to you.
About the packaging.
Most of our products are equipped with handbags, packaging a product into a large carton. We can customize pendants, color boxes, es, and barcode designs.
About the time of delivery.
After confirming the order, we will charge you the deposit and check all the details. Generally, the time required for mass production is 35-40 days.